Outstanding Result for Problematic Pond
This Pond had a long term duck weed problem that the council had never been able to clear, this was at Gough Park, Cecil Hills, NSW.
As it is fed from stormwater run off therefore receiving flow-ins of nutrients and other unwanted additives all
feeding the duck weed and causing it's out of control spread.
This is the result after 6 weeks after using 10 the PBE blocks as well as introducing 2kg of live bacillus bacteria to kickstart their proliferation.
The success of this process where this pond was simply needing a cleanup from an aesthetics perspective as well as a water health concern, needs no words, the images speak for themselves!